Our wORK / Projects / K-12 Education / Glacier Peak High School

Glacier Peak High School

A 230,000 SF facility at the south end of the Snohomish School District, it is the second high school in Snohomish and was built to relieve overcrowding.

Glacier Peak High School
Owner

Snohomish School District

Architect

NAC Architecture

Cost

$62M (2008)

Opened in September 2008, it serves grades 9-12, up to 1,500 students. There are two wings: The Activities Wing is a single story concrete building with gymnasiums and the theater; The Academics Wing is a three story steel framed building with classrooms, library, administration and labs. Athletic facilities include tennis courts, a full football/track field, baseball and softball fields.

Glacier Peak High School 1
Glacier Peak High School 2
Glacier Peak High School 3
Recent Projects